CAMPUS WIDE ELECTRICAL SHUT DOWN – MAY 22, 2020

In Announcements, by , on May 21st, 2020

As a result of the December 2018 power outage that impacted our primary electrical service, Facility Services is undertaking the testing of all Sectional Switches, High Voltage cables, and Switchgear equipment. This is to assess the condition and prevent problems in the future. In order to complete testing, the entire campus will have a scheduled 8 hr. + or – electrical shutdown (approximately 7:00AM – 3:30PM) on Friday, May 22, 202