NYS Fire inspections

In Announcements, by , on February 1st, 2017

Please find listed below the currently scheduled buildings for upcoming annual NYS fire inspections being conducting on our campus beginning Jan. 31 through Feb. 16, 2017. The fire marshal reserves the right to change these dates at any time.

In preparation for this inspection if you could take a look at your areas for items that might need attention and if found please promptly place a work order for their repair. Such items that can easily be addressed include the following:

  • Exit sign not lit
  • Use of a standard extension cord, we may only use surge protectors
  • Space heater not near anything combustible
  • A cover plate on a receptacle/switch that is loose
  • Any item within 18” of a sprinkler head
  • A means of egress that is blocked or restricted
  • A fire door that does not latch on its own (fire door has a label on the hinge side)
  • A fire door propped open
  • Thank-you for your assistance and cooperation to reduce our violations and if you have any questions or concerns please contact facility services at extension 8430.

BUILDING                                            1ST INSPECTION

ACADEMIC COMPLEX                     2/9/2017

ALUMNI                                               2/15/2017

ALUMNI-HR/BOILER HSE              2/15/2017

APT#1                                                   2/7/2017

APT#2                                                   2/7/2017

APT#3                                                   2/7/2017

APT#4                                                   2/7/2017

APT#5                                                   2/7/2017

APT#6                                                   2/7/2017

BAILO                                                    2/15/2017

BUTLER                                                 2/15/2017

CASTELLANI                                        2/6/2017

CLET                                                       2/3/2017

DEPAUL                                                                2/13/2017

DUNLEAVY                                          2/9/2017

DWYER                                                 2/9/2017

GACIOCH                                             2/16/2017

GALLAGHER                                       2/9/2017

GOLISANO                                          2/10/2017

KIERNAN                                             2/13/2017

LIBRARY                                               2/13/2017

LYNCH                                                   2/6/2017

MARION-PO/COM DOC                                2/15/2017

O’DOUOUGHUE                                               2/6/2017

O’SHEA                                                 2/2/2017

PHYSICAL PLANT                              2/10/2017

ROOSEVELT                                        2/10/2017

  1. VINCENT’S ANNEX 2/16/2017
  2. VINCENT’S HALL 2/16/2017

SETON                                                  2/1/2017

THEATER ANNEX (Off Site)           2/13/2017

VARSITY VILLAGE #1                       2/3/2017

VARSITY VILLAGE #2                       2/3/2017

VARSITY VILLAGE #3                       2/3/2017

VARSITY VILLAGE #4                       2/3/2017

VARSITY VILLAGE #5                       2/3/2017

VARSITY VILLAGE #6                       2/3/2017

VINCENTIAN RESIDENCE               2/16/2017