NYS Fire Inspections

In Announcements, by , on February 22nd, 2018

Please find listed below the currently scheduled buildings for upcoming annual NYS fire inspections being conducting on our campus beginning Feb. 20, 2018 through March 12, 2018. The Fire Marshal reserves the right to change these dates at any time.

In preparation for this inspection if you could take a look at your areas for items that might need attention and if found please promptly place a work order for their repair. Such items that can easily be addressed include the following:

  • Exit sign not lit
  • Use of a standard extension cord, we may only use surge protectors
  • Space heater not near anything combustible
  • A cover plate on a receptacle/switch that is loose
  • Any item within 18” of a sprinkler head
  • A means of egress that is blocked or restricted
  • A fire door that does not latch on its own (fire door has a label on the hinge side)
  • A fire door propped open
  • Thank-you for your assistance and cooperation to reduce our violations and if you have any questions or concerns please contact facility services at extension 8430.

BUILDING                                                                 1st Inspection

  • Campus Safety                                                  2/20/18
  • Tennis Shed                                                       2/20/18
  • Timon Hall                                                         2/20/18
  • Dwyer Arena                                                      2/21/18
  • Kiernan Center                                                  2/21/18
  • Academic Complex/Bisgrove                         2/22/18
  • Dunleavy Hall                                                    2/22/18
  • Gallagher Center                                               2/22/18
  • Gacioch                                                               2/28/18
  • Lynch Hall                                                          2/28/18
  • O’Donoughue Hall                                            2/28/18
  • Roosevelt House                                                2/28/18
  • Vincentian Residence                                       2/28/18
  • Student Apartments 1-6                                   3/1/18
  • VV Houses 1-6                                                    3/1/18
  • Clet Hall                                                               3/2/18
  • (Residence space, dining, theatre, offices)
  • O’Shea Hall                                                          3/5/18
  • Seton Hall                                                            3/6/18
  • Bailo Hall                                                             3/7/18
  • DePaul Hall                                                         3/7/18
  • Golisano                                                               3/7/18
  • Library                                                                  3/7/18
  • Alumni Annex                                                     3/8/18
  • Alumni Hall                                                         3/8/18
  • St. Vincent’s Annex                                            3/8/18
  • St. Vincent’s Hall                                                3/8/18
  • Butler                                                                    3/12/18
  • Marian House                                                     3/12/18
  • Physical Plant                                                      3/12/18
  • Theatre Annex                                                     3/12/18